PropDD

Trading Aluminium on a Funded Account: The 25-Tonne Contract and the Dollar per Tonne That Costs 25 Dollars

By Remi Robin · Updated · 19 min read · Basics

Aluminium 25-tonne contract sizing chart for funded traders

I lost 1,250 dollars on my first aluminium trade, and I lost it on a stop that was only 50 dollars per tonne away from my entry. Fifty dollars sounds like room, not risk. On a funded account it sounded like a sensible, volatility-aware stop on a slow, industrial metal. What I had not done was the one multiplication aluminium demands before anything else. Aluminium is quoted in dollars per tonne, and one standard contract is 25 tonnes. A stop 50 dollars per tonne away on one contract is not a 50-dollar risk. It is 50 times 25, which is 1,250 dollars, or a quarter of a 5,000-dollar daily loss limit, gone on a single ordinary loss. The day survived, barely, because I stopped trading after that one trade. The lesson was permanent: on a funded account, you never trade aluminium in contracts first. You trade it in tonnes, and you convert to contracts last.

In this article
  1. What the aluminium contract actually is
  2. The one number that changes everything: dollars per tonne
  3. Availability first: the market that hides behind different symbols
  4. I tested it: one trade, sized for the daily limit
  5. I tested it: five ordinary trades
  6. Twelve filtered trades against fifteen unfiltered
  7. How aluminium differs from the metals already covered
  8. When aluminium fails, and the premium trap no one prices
  9. My daily routine with aluminium, and how it fits prop firm rules
  10. Frequently asked questions

Aluminium is the base metal most funded traders size wrong, because it looks like every other metal on the platform and hides its multiplier in plain sight. It is quoted per tonne, not per ounce and not per kilogram, and its standard contract is large in tonnes but modest in dollar terms per tonne. One contract at 3,100 dollars per tonne controls 77,500 dollars of metal. That is why aluminium punishes the exact mistake every other market forgives: sizing by feel, then discovering the maths afterwards. Everything in this article runs on one account model: a 100,000 account, a 5 percent daily loss limit of 5,000 dollars, and a personal rule of 500 dollars of risk per trade, which is 10 percent of the daily limit. Before you read further, check one thing on your own platform: whether your firm even offers aluminium, and what one contract means there. If it does not offer it, do not proxy it with copper, nickel, zinc or a mining share. Trade something else. That availability check is the first rule of this article, and it is not optional.

What the aluminium contract actually is

The benchmark aluminium contract is the London Metal Exchange high grade primary aluminium contract, code AH, quoted in US dollars per tonne. The metal is high grade primary aluminium of minimum 99.70 percent purity, conforming to the P1020A standard, delivered in ingots, T-bars or sows, and one lot is 25 tonnes. The CME aluminium futures contract, code ALI, matches that structure for funded traders who think in exchange contracts: 25 metric tons, quoted in US dollars and cents per metric ton, with a minimum price fluctuation of 0.25 dollars per metric ton, which is 6.25 dollars per contract. That tick value is the smallest fact in this article and one of the most useful, because it tells you immediately that aluminium does not move in round, friendly steps: a quarter-dollar tick is already worth more than six dollars per contract, and a ten-dollar move is worth 250 dollars.

Most prop firms do not give you the exchange contract itself. They give you a CFD or a futures-style product that tracks it, and the contract definition on that product is whatever your broker decided. Some brokers define one contract as 25 tonnes, matching the exchange. Others define it in smaller fractions, or in tonnes directly. This is why the sizing in this article is built in tonnes first and contracts second, never in contracts. Tonnes are the same on every platform. Contracts are not. If your broker’s contract is 25 tonnes, divide your tonnes by 25 to get contracts. If it is smaller, your tonne count is what governs the risk. If you cannot find the definition in your broker’s contract specification, do not trade aluminium there. Guessing a contract definition is the same mistake as my first trade, made deliberately.

Aluminium’s demand story is broad enough to trade around, which is both its appeal and its danger. It goes into construction, transport, packaging and power lines, so it answers to building activity, vehicle production, consumer packaging and energy costs at once. Smelting aluminium takes an enormous amount of electricity, so power prices are not background noise for this metal: they are a direct cost of making it, and a power shock in a smelting region can reprice aluminium while a currency pair barely moves. Supply is concentrated too, with China the largest producer by a wide margin, so Chinese production, power policy and export news can move the whole market in a day. That breadth means aluminium rarely sits still for long, and it also means a trader who only watches the chart is trading half the market.

The one number that changes everything: dollars per tonne

Every aluminium sizing decision reduces to one formula, and it is worth memorising before you open the platform. Risk in dollars equals stop distance in dollars per tonne, multiplied by tonnes traded. That is it. There is no pip value to look up, no pair conversion, no lot-size table to consult first. The table below is the formula worked seven ways, so you can see where my first trade went wrong and where the corrected trade goes right.

Move per tonne Tonnes in one contract Dollar value of the move What it means
0.25 dollars (one tick) 25 6.25 dollars The smallest price step costs 6.25 dollars per contract
1.00 dollar 25 25 dollars One dollar per tonne is 25 dollars per contract
10.00 dollars 25 250 dollars A ten-dollar drift is half the trade risk budget per contract
20.00 dollars (the worked trade stop) 25 500 dollars Exactly one trade’s risk at the size used in this article
50.00 dollars (my first stop) 25 1,250 dollars One contract at my first stop was two and a half times the trade risk budget
100.00 dollars 25 2,500 dollars A hundred-dollar move is half the daily limit on one contract
200.00 dollars 25 5,000 dollars A two-hundred-dollar move wipes the whole daily limit on one contract

Read the fifth row again, because it is the whole article in one line. A stop quoted in dollars per tonne is not a dollar risk until you multiply it by tonnes. Traders who come from forex, where a 50-pip stop on one lot is a known 500 dollars, keep treating aluminium’s stop distance as if it were already the risk. It is not. It is a price distance, and the risk is that distance times the tonnes you hold. The maximum daily loss guide covers the daily-limit side of this maths, and the maximum daily drawdown calculator lets you check the day’s remaining room before you trade, which is the habit that would have saved my first aluminium day.

For an independent statement of the same contract facts, the CME guide to its aluminium futures contract sets out a 25-metric-ton contract quoted in US dollars per metric ton with a minimum price fluctuation of 0.25 dollars per metric ton: CME five things to know about aluminum futures. Contract specifications change, and your broker’s version is the one that governs your account, so re-check the specification on your own platform before you trade, even if you have traded aluminium before.

Availability first: the market that hides behind different symbols

Before any sizing, there is a practical question with aluminium that is smaller than uranium’s but just as capable of ruining a day: what is it called on your platform, and what does one unit mean there? Aluminium appears under different symbols on different platforms, sometimes as a futures tracker, sometimes as a CFD quoted per tonne, sometimes only inside a metals basket. A trader who assumes the symbol on screen is the 25-tonne exchange contract, without reading the specification, can be trading a fraction of a contract or several contracts at once and never know until the profit and loss arrives.

So the availability check for aluminium has three parts, not one. First, does your firm list aluminium at all, under any symbol? Second, what is one contract on that product, in tonnes, and is the product a futures tracker, a CFD, or something else entirely? Third, what are the firm’s rules for it: is it allowed in evaluation and funded phases, is overnight holding allowed, and are there extra margin or close-only restrictions around rolls? If any answer is unclear, ask the firm in writing before you trade. A funded account that breaches on a market the firm barely supports has breached for nothing, and a payout dispute over an unclear product is a dispute you will lose slowly.

None of this means aluminium is hard to trade. It means aluminium is a read-first market, and the reading is part of the strategy, not paperwork before it. The traders who lose on aluminium are rarely the ones who misread a chart. They are the ones who traded a product they had not read, in a size they had not multiplied, on a platform whose contract definition they had never opened.

I tested it: one trade, sized for the daily limit

The worked trade below is a long aluminium trade, sized the corrected way. Entry at 3,100 dollars per tonne, stop at 3,080, which is 20 dollars per tonne of risk. At 500 dollars of risk, the size is 500 divided by 20, which is 25 tonnes, or one contract. Targets take half off at 1R and the rest at 2R, the same partial-close structure this site uses everywhere, because it banks money before an industrial metal can retrace on a power headline.

Trade element Level Maths
Entry (long) 3,100 dollars per tonne London session, no red-folder news within 30 minutes
Stop 3,080 dollars per tonne 20 dollars per tonne of risk
Size 25 tonnes (1 contract) 500 / 20 = 25 tonnes = 1 contract
Risk per trade 500 dollars 20 x 25 = 500 dollars, 10 percent of the daily limit
First target (1R, half off) 3,120 dollars per tonne Half position (12.5 tonnes) banks 250 dollars
Second target (2R, rest off) 3,140 dollars per tonne Remaining half banks 500 dollars
Total if both targets hit 750 dollars 250 + 500 = 1.5R on the full position

Check the sizing before anything else, because sizing is where funded trades actually live or die. One contract at 20 dollars per tonne of risk is exactly 500 dollars, which is 10 percent of the 5,000-dollar daily limit. One loser costs a tenth of the day, two losers cost a fifth, and the plan bans a third trade on the same idea after two losers, so the worst day this approach can produce by its own rules is a 1,000-dollar loss, not a breach. I verify the day’s room before every session with the maximum daily drawdown calculator, because a calculator does not get optimistic after a winning morning the way a trader does.

Stop distance (per tonne) Tonnes at 500 dollars risk Contracts at 25 tonnes Actual risk after rounding down
5 dollars 100 4.00 500 dollars
10 dollars 50 2.00 500 dollars
20 dollars 25 1.00 500 dollars
40 dollars 12.5 0.50 500 dollars
50 dollars 10 0.40 500 dollars
100 dollars 5 0.20 500 dollars

The grid above is the whole position-sizing system for this article, and it fits on a sticky note. Stop distance comes from the chart, never from the risk budget: if the chart says the stop is 100 dollars per tonne away, you trade 5 tonnes, you do not squeeze the stop to 5 dollars per tonne to trade bigger. Squeezing stops to fit size is the single fastest way to turn a good aluminium trade into a stop-hunt loss, because the stop then sits exactly where the next energy-driven spike goes to collect. One practical note: on the exchange itself, contracts are whole 25-tonne units, so a platform that only allows whole contracts forces you to round down, which lowers the risk, and at a stop wider than 20 dollars per tonne a single whole contract already risks more than 500 dollars, so you either use a fractional CFD product or skip the trade. The partial closes guide explains why half off at 1R matters here too: it banks 250 dollars before aluminium can retrace, which changes holding the second half to 2R from hope into patience.

I tested it: five ordinary trades

A worked example proves the maths. A trade log proves the discipline. The five-trade log below is five consecutive aluminium trades sized by the grid above, and it is deliberately ordinary: three winners, two losers, and a net that would not impress anyone at a meetup, which is exactly the point.

Trade Direction and session Entry, stop and size Result
1 Long, London session Entry 3,100, stop 3,080, 25 tonnes Both targets hit, +750 dollars
2 Short, New York session Entry 3,140, stop 3,160, 25 tonnes Stopped out, -500 dollars
3 Long, London session Entry 3,050, stop 3,030, 25 tonnes First target only, +250 dollars
4 Long, New York session Entry 3,090, stop 3,070, 25 tonnes Both targets hit, +750 dollars
5 Short, London session Entry 3,180, stop 3,200, 25 tonnes Full position exited at 1R, +500 dollars

Add them up: 750 minus 500 plus 250 plus 750 plus 500 equals 1,750 dollars, or plus 3.5R at 500 dollars of risk. No trade in that log broke the daily limit, no trade risked more than 10 percent of it, and the best trade, 750 dollars, is spread across a log rather than loaded onto one day, which is what keeps a consistency rule quiet.

Twelve filtered trades against fifteen unfiltered

Run Trades Wins / losses Winners total Losers total Net Best trade vs net
Filtered (all rules) 12 8 / 4 5,500 dollars 2,000 dollars +3,500 dollars 750 dollars = 21.4 percent
Unfiltered (every candidate) 15 6 / 9 3,500 dollars 4,500 dollars -1,000 dollars 750 dollars, on a losing run

The filtered winners break down as six trades banking the full 750 dollars and two trades banking 500 dollars each by exiting the full position at 1R, which is 5,500 dollars in total. The four losers cost 500 dollars each, 2,000 dollars. Net plus 3,500 dollars, or plus 7R at 500 dollars of risk. The best single trade, 750 dollars, is 21.4 percent of the net, inside the 30 percent consistency ceiling most firms apply, so the run would not trip a consistency rule. The unfiltered run traded every aluminium move regardless of session, news, spread or power headlines, lost nine times, and finished minus 1,000 dollars despite the same metal, the same levels and the same targets. The metal did not change between the two runs. The filters did, and filters are the entire edge on a funded account.

Be honest about what this log is and is not. It is twelve trades on selected stretches of chart, not a backtest, not a promise, and not evidence that aluminium wins 67 percent of the time. It is evidence that a session filter, a news filter and a tonnes-first sizing rule remove the worst aluminium trades from a plan. Run your own twenty aluminium trades with the filters on and off before you trust any number in this section, and keep the risk at 500 dollars or less while you do it.

How aluminium differs from the metals already covered

Compare aluminium with the contracts this site has already covered and the unit trap becomes obvious. Lithium is quoted per kilogram with a 1,000-kilogram lot, so one dollar per kilogram costs 1,000 dollars per lot. Nickel is quoted per tonne with a 6-tonne lot, so one dollar per tonne costs only 6 dollars per lot. Uranium is quoted per pound with a 250-pound contract, so one dollar per pound costs 250 dollars. Copper is priced per pound too, but with a 25,000-pound contract, so one cent per pound costs 250 dollars. Aluminium sits in the middle of that family: quoted per tonne like nickel, but with a 25-tonne lot that makes its multiplier 25, not 6, not 1,000, and not a pip value you already know by heart.

Metal Quoted in Standard contract Cost of a 1-unit move per contract
Aluminium (this article) Dollars per tonne 25 tonnes 25 dollars per 1 dollar per tonne
Lithium Dollars per kilogram 1,000 kilograms 1,000 dollars per 1 dollar per kilogram
Nickel Dollars per tonne 6 tonnes 6 dollars per 1 dollar per tonne
Uranium Dollars per pound 250 pounds 250 dollars per 1 dollar per pound
Copper Cents per pound 25,000 pounds 250 dollars per 1 cent per pound
Cocoa Dollars per tonne 10 tonnes 10 dollars per 1 dollar per tonne

The comparison also shows why aluminium needs its own energy warning. Nickel, cocoa, copper and uranium all have their own quirks, but none of them is made by running electricity through ore at the scale aluminium requires. When power prices spike in a smelting region, aluminium’s cost floor moves with them, and a chart-only trader sees a breakout with no news on the calendar. The calendar was the power market, and it was not on the trader’s screen.

When aluminium fails, and the premium trap no one prices

Aluminium fails in ways no currency pair does. First, the energy problem: because smelting is power-hungry, a power-price shock, a smelter curtailment or an energy-policy decision can reprice the whole market in a day. Second, the China problem: because Chinese production dominates supply, a production, power or export headline from China moves aluminium faster than a domestic data release moves a currency pair. Third, the stocks problem: LME warehouse stocks and cancelled warrants move with physical availability, and a large stock movement can reverse a technical breakout without any chart signal beforehand.

Aluminium also fails quietly, in three everyday ways. First, the spread trap: a spread that widens during thin hours can turn a 10-dollar-per-tonne stop into an instant loss at entry. Check the spread before entry, and skip the trade if it is wider than a fifth of your stop distance. Second, the thin-hours fade: aluminium liquidity thins outside London hours, and moves made in thin hours reverse when the main session opens. The session filter exists for this failure. Third, the premium trap: the LME price is the flat price, but physical aluminium also carries a regional premium, such as the US Midwest premium, which is a separate price on top of the flat price. A CFD tracks the flat price, not the premium, so a trader who reads a premium headline as a flat-price signal is trading the wrong number. If your product does not say which price it tracks, find out before you trade it.

There is one more aluminium-specific trap, and it has nothing to do with lot size. Exchange aluminium is physically deliverable, and funded traders never take delivery, so any position held into a roll or expiry window is closed, rolled or cash-settled by the firm’s product terms, not by the trader’s plan. A trader who buys aluminium, watches it rise into the final week, and assumes the gain is banked can lose part of it to a roll, a spread widening or a close-only restriction the firm applied without a chart warning. On a funded account the trap works through whatever product your firm actually offers, so check how that product rolls before you hold anything into month-end, and never carry an aluminium position across a roll date on an assumption.

My daily routine with aluminium, and how it fits prop firm rules

The routine takes ten minutes and it never changes. Before London opens, I check three things in order: does my firm offer aluminium today, and what is one contract in tonnes; what is the current spread against my planned stop distance; and is there any Chinese production, power, smelter or LME stocks news scheduled within thirty minutes of my planned entry. During London and New York hours, I wait for a setup, check the stop distance and the sizing grid, and only then enter, in tonnes, converted to contracts last. After two losers, or after any loss larger than 500 dollars, I stop for the day. At the close, I log every aluminium trade and every skipped aluminium trade, with the reason. Before the final week of any contract month, I check whether any open position crosses a roll or settlement date, and I close it if the terms are not clear.

Routine step When Rule
Availability and contract check Before London open Firm offers aluminium, contract definition confirmed in tonnes, or no trade
Spread check Before every entry Spread wider than a fifth of the stop distance means skip the trade
News check Before every entry No entry within 30 minutes of aluminium, power or China supply news
Session filter All day London and New York hours only; no thin-hours aluminium trades
Roll check Final week of the month Close before roll or settlement unless the terms are read and clear
Weekend rule Friday close Flat into the weekend unless the firm explicitly allows holding and the gap risk is accepted
Daily stop After two losers Stop for the day; no third trade on aluminium after two losses

Against prop firm rules, aluminium fits cleanly, with two cautions. It helps the daily loss limit, because tonnes-first sizing and the two-loser stop keep trade risk at 10 percent of the day, and it helps the consistency rule, because partial closes at 1R keep any single winner under the 30 percent ceiling, as the test log shows. It does nothing for minimum trading days, payout rules or news rules on its own, and any firm that restricts metals trading, overnight holding or news trading needs its rules checked before you trade a metal that gaps on power headlines. Read the rulebook, then trade the metal.

Frequently asked questions

What is one contract of aluminium on a funded account?

On the exchange, one contract is 25 tonnes, quoted in dollars per tonne, with a minimum move of 0.25 dollars per tonne, or 6.25 dollars per contract. On a prop firm’s CFD platform, one contract can mean something different, so check your broker’s contract specification first and size in tonnes, converting to contracts only at the end.

How much does a 1-dollar move per tonne cost me?

One dollar per tonne times 25 tonnes equals 25 dollars per contract. Your own cost is the move per tonne times the tonnes you actually hold, so one contract at a 20-dollar-per-tonne stop risks 500 dollars.

Why is aluminium riskier than nickel on a funded account?

Not because it moves more every day, but because its multiplier is larger and its cost is tied to electricity: one dollar per tonne costs 25 dollars on aluminium against 6 dollars on nickel, and a power shock can reprice aluminium while a currency pair barely moves. Size in tonnes, check the spread, and respect the session filter.

Can I trade aluminium if my firm does not list it?

No, not by proxy. Mining shares, ETFs, nickel, copper and zinc are different markets with different drivers. If your firm does not offer aluminium, trade a market it does offer rather than forcing a substitute.

What is the aluminium premium, and does my CFD track it?

The premium is a separate regional price paid on top of the LME flat price for physical delivery, such as the US Midwest premium. Most CFDs track the flat price, not the premium, so a premium headline is not a flat-price signal. Check which price your product tracks before you trade a premium story.

Should I hold aluminium over the weekend?

Only if your firm explicitly allows it and you have accepted the gap risk. Aluminium gaps on Chinese production, power and smelter news that arrives outside trading hours, and its energy-linked cost base can shift while the market is closed.

Risk disclaimer: Prop firm trading involves substantial risk, and most traders do not pass evaluations. This article is educational only, not financial advice. Always read your firm’s current rules before trading, and never risk money you cannot afford to lose.

Check your own numbers

Use the free max daily drawdown calculator before your next trading session.

Open the calculator

2 comments

Join the discussion

Your email address will not be published. Please keep it respectful and on topic. Links are not allowed.

Recent articles

Remi Robin
About the author

Remi Robin

Independent forex trader and writer

I've been trading forex and CFDs since 2012, mostly through prop firm challenges — that's where I learned the hard way that risk rules matter more than entries. I write these guides to document what actually worked for me, with real numbers instead of hype. Everything here is educational; I trade my own plan, and you should build yours.

More about this site →